- Joined
- Oct 31, 2021
- Threads
- 187
- Messages
- 2,212
- Reaction score
- 2,654
- Location
- New Jersey
- Vehicle(s)
- Chevrolet
- Engine
- 2.5L Hybrid
- Thread starter
- #1
Ordered a base hybrid XL with only a drop-in bedliner in October, 2021. Was told by salesman at time of order a delivery date of at the earliest March, 2022 to at the latest August 2022. In August 2022, I was given a build date of September 5.That date has been moved ELEVEN times including the megalie date of January 9, 2023. Called last week, I was told I no longer have that date and my build date is now āundetermined.ā Being very generous with a five month cushion after your order date, what have you had to do to your current vehicle because of Fordās lies and screw-ups? For me, I have had to put in a new fuel pump, four new tires, and two new headlights. Check engine light is now on and local repair shop says I need some kind of gas sensor that I havenāt decided if I will fix. As for trade in value, according to Carvana price , I have lost $2,000 since January 2022. Assuming hybrid mpg is 40, I have been paying double for gas. And who knows how much extra it will cost me with interest rates. Thanks a lot Ford ! I know there are others out there that have had to spend a lot more because of the Ford debacle. What have they forced you to do on yours?
Sponsored