Sponsored

Change order for a 2023 Maverick?

MD_Maverick

2.5L Hybrid
Well-known member
First Name
Ben
Joined
Jan 13, 2022
Threads
5
Messages
53
Reaction score
49
Location
Maryland
Vehicle(s)
Honda Civic
Engine
2.5L Hybrid
Has anyone else wanted to change their order for 2023 when getting bumped?

I signed up for a Hybrid XL with just 360 and tow hitch. Dropped the 360 to try and get it earlier but that didn’t workout. I wanted to at least add the 360 back on but really want to consider giving them more money and going XLT with some add-ons. Curious if anyone has changed anything for their 2023 order.
Sponsored

 
 







Top