Sponsored

Anyone ever get moved up after scheduling?

DuffCon

2.5L Hybrid
Well-known member
Joined
Sep 21, 2022
Threads
14
Messages
187
Reaction score
217
Location
Bay Area, CA
Vehicle(s)
Subaru Ascent
Engine
2.5L Hybrid
For those who were scheduled a bit out (like 2 months) Have you gotten your production week pushed up at all? I just figured out that the next worst thing to not having a build week is waiting over 2 months for that day to come!
Sponsored

 

WNYEscapee

2.0L EcoBoost
Well-known member
First Name
TJ
Joined
Jul 6, 2022
Threads
1
Messages
575
Reaction score
932
Location
BFLO
Vehicle(s)
2023 Maverick, 2019 Cherokee
Engine
2.0L EcoBoost
Clubs
 
Oddly when I had tracked my order the actual date listed did fluctuate forward day, from 4/12 to 4/11, but now it's moved back three to 4/15.
I know it probably doesn't make much difference, nor does it matter, but as long as it isn't pushed back a month, then another, and another, or something like that, it is what it is. I went into this knowing that nothing was for certain, and though it looked promising right out of the gate with it being in review for two and a half weeks, it stopped there until early February when it got scheduled. At this point I expect it to not be right on the initial date listed.
 

Mtleyr1

2.0L EcoBoost
Member
First Name
Ron
Joined
Sep 20, 2022
Threads
0
Messages
22
Reaction score
33
Location
28054
Vehicle(s)
18 F150 Platinum, 11 BMW X5 50i, 18 VW Golf R
Engine
2.0L EcoBoost
I just checked my status as my Maverick was due to be built next week with a build week of 03/23. Now shows "In Production" and build week of 03/22. Was originally scheduled for a build week of 03/27.
 

MoreGas

2.5L Hybrid
Member
Joined
Jan 30, 2023
Threads
3
Messages
22
Reaction score
58
Location
Central FL
Vehicle(s)
22' Jeep Gladiator, 19' Mazda CX-5
Engine
2.5L Hybrid
I was originally scheduled 3/21, then it moved to 3/17 for a week or two, then back to 3/21. Today I checked it is 3/25. Hopefully it stops moving to the right, but I can't complain yet considering some people had their production date constantly pushed out for months, or no production date at all.
 

Sponsored

Porter117

2.5L Hybrid
Member
Joined
Aug 3, 2022
Threads
0
Messages
13
Reaction score
20
Location
Reno, NV
Vehicle(s)
2001 Jeep TJ
Engine
2.5L Hybrid
Mine was moved up a week from 2/20 to 2/13. It also delivered 3/3, about two weeks sooner than the email was estimating.
 

IndyChill

2.5L Hybrid
Well-known member
First Name
Rob
Joined
Sep 19, 2022
Threads
1
Messages
54
Reaction score
75
Location
St Pete FL
Vehicle(s)
2023 Hybrid XL Maverick
Engine
2.5L Hybrid
Mine went from 3/31 to 3/29.
 
OP
OP
DuffCon

DuffCon

2.5L Hybrid
Well-known member
Joined
Sep 21, 2022
Threads
14
Messages
187
Reaction score
217
Location
Bay Area, CA
Vehicle(s)
Subaru Ascent
Engine
2.5L Hybrid
Arg, first I was 4/10, then 4/11, then 4/12. Then moved back to 4/11 for weeks. Yesterday I moved to 4/14. The stress!!
 

paneubert

2.0L EcoBoost
Well-known member
Joined
Jan 17, 2022
Threads
25
Messages
2,167
Reaction score
3,384
Location
Seattle
Vehicle(s)
2023 XL/4K/AWD/CoPilot/CactusG/SlidingRearWindow
Engine
2.0L EcoBoost
2022 Model year data, but yes.....fluctuations.


1. Scheduled to Week (Week -of Oct-17-2022 ) for the build process, Paul.
ETA(delivery): Dec-16-2022 - Dec-22-2022 

2. The schedule week of production is as follows: October 27, 2022. The estimated time of complete production is December 16-22, 2022

3. Your vehicle is expected to go into production on 10/17/22! It's also estimated to be delivered to the dealership between 12/16 and 12/22/22! Just in time for Christmas!

4. "Production is due to begin on Week -of Oct-24-2022"

10/14: Chat agent says.... Your current order status is In Order Processing and has been scheduled to week of Oct-31-2022. At this time the order has an estimated delivery date between Dec-16 - Dec-22 which is only an estimate and what is currently on the order status.

10/20: Chat agent says..... I show your Maverick is scheduled for production the week of November 14th. The ETA is December 16th-December 22nd. With your VIN and sales code, you can start tracking your vehicle order at: https://shop.ford.com/vehicleordertracking
Please reach out to your selling dealership if you would like to request further details.

10/28: Chat agent says..... "I am currently seeing the scheduled day for Production is November 18th, 2022. I see the estimated time of arrival from December 16th to December 22nd. However, once in Transit this may reflect a different final estimated date."

11/18/22: Chat agent says..... "I am able to see that your vehicle is In Production and in the Body Shop process. This update was provided on Nov-17-2022. I don't see an ETA for completion yet, but please feel free to check back in with us for a status update"

11/21/22: Chat agent says..... "Your vehicle was shipped via Railcar # BNSF301634 (Ferrocarril Mexicano S.a. De C.v.) on 11/20/22 from the plant in Mexico to its first interim destination. It's estimated to be delivered to the dealership between 12/11 and 12/17/22."

11/28/22: Chat agent says..... "Nogales, AZ. I am seeing the estimated time of arrival is from December 11th to December 17th, 2022."

12/2/22: Chat agent says..... "There is an estimated date for delivery to the dealer of between today and 12/8/22."

12/6/22: Chat agent says..... "The vehicle has been received by a carrier at a ramp location (Ramp Tb, Alliance, TX) with an ETA between 12/5- 12/11."
 

Pickles

2.0L EcoBoost
Well-known member
First Name
Calvin
Joined
Jan 29, 2022
Threads
24
Messages
780
Reaction score
711
Location
Canada
Vehicle(s)
Kia rio, kia sorento
Engine
2.0L EcoBoost
For those who were scheduled a bit out (like 2 months) Have you gotten your production week pushed up at all? I just figured out that the next worst thing to not having a build week is waiting over 2 months for that day to come!
Totally feel where youre coming from. I wasnt antsy about getting my Maverick until it was scheduled. From that point forward i was the most annoyiny customer my salesman had dealt with im certain haha i didnt get pushed up but last year this time, when this forum was more full of 1st year orderers waiting for their builds a few here and there got bumped up. So its possible. But unlikely
 
Sponsored
OP
OP
DuffCon

DuffCon

2.5L Hybrid
Well-known member
Joined
Sep 21, 2022
Threads
14
Messages
187
Reaction score
217
Location
Bay Area, CA
Vehicle(s)
Subaru Ascent
Engine
2.5L Hybrid
For the first time, the tracker information has changed it's "last updated" field. Now updated today 3/29, status has changed from "scheduled' to "in production" with the scheduled week changing to 4/12/23. Maybe a sign of an earlier build? Or just the assemblies are starting production and the final assembly will happen that week? Who knows?

No window sticker yet, but I understand that usually is a week before.
 

HTX

2.5L Hybrid
Well-known member
First Name
Jon
Joined
Apr 12, 2022
Threads
9
Messages
546
Reaction score
517
Location
Houston TX
Vehicle(s)
CR-V
Engine
2.5L Hybrid
Scheduled for 4/14 (been bouncing around a few days plus or minus for the last month ). Checked yesterday and to my surprise it was “in production” window sticker went live today!
 
OP
OP
DuffCon

DuffCon

2.5L Hybrid
Well-known member
Joined
Sep 21, 2022
Threads
14
Messages
187
Reaction score
217
Location
Bay Area, CA
Vehicle(s)
Subaru Ascent
Engine
2.5L Hybrid
Hey! Same situation here almost exactly (see above) No window sticker yet tho....

Now i'll be clicking that link 500 times today! :oops:
 
  • Like
Reactions: HTX

ptsctt

2.5L Hybrid
Member
First Name
65 Falcon
Joined
Nov 20, 2022
Threads
2
Messages
10
Reaction score
26
Location
SF bay area
Vehicle(s)
1965 ford Falcon, 1954 Chevy 5 window truck
Engine
2.5L Hybrid
build date was for the week of 4/14/23 and just checked to my surprise in production with no sticker. original order 10/29/21, converted to 2023 9/15/22, hybrid lariat with lux package and no extras.
 
OP
OP
DuffCon

DuffCon

2.5L Hybrid
Well-known member
Joined
Sep 21, 2022
Threads
14
Messages
187
Reaction score
217
Location
Bay Area, CA
Vehicle(s)
Subaru Ascent
Engine
2.5L Hybrid
A bit of caution. I have a Mach-E that's "in production" scheduled for the week of 5/1, so you know.
Sponsored

 
  • Like
Reactions: HTX
 




Top