Sponsored

Bad Actor

2.0L EcoBoost
Well-known member
First Name
Christopher
Joined
Jan 15, 2022
Threads
7
Messages
471
Reaction score
1,009
Location
SE Missouri
Vehicle(s)
01 Ranger XLT, 73 Mustang Base, 02 Toyota Camry
Engine
2.0L EcoBoost
Can't wait for Thursday's again.
 

DavesMav

Well-known member
First Name
Dave
Joined
Oct 12, 2021
Threads
5
Messages
452
Reaction score
605
Location
FL
Vehicle(s)
Maverick
Considering 9/29 is next week, it's odd that the chart doesn't show the build week(s) for Mavericks.. I wonder if they'll push the start of 2023 scheduling back another week and possibly add another week or two of 2022 production.
 

Bad Actor

2.0L EcoBoost
Well-known member
First Name
Christopher
Joined
Jan 15, 2022
Threads
7
Messages
471
Reaction score
1,009
Location
SE Missouri
Vehicle(s)
01 Ranger XLT, 73 Mustang Base, 02 Toyota Camry
Engine
2.0L EcoBoost
No 22 Mav's are being scheduled this week.
 

Sponsored

JoeTime

2.5L Hybrid
Well-known member
First Name
Joe
Joined
Apr 27, 2022
Threads
15
Messages
244
Reaction score
238
Location
47025
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
Considering 9/29 is next week, it's odd that the chart doesn't show the build week(s) for Mavericks.. I wonder if they'll push the start of 2023 scheduling back another week and possibly add another week or two of 2022 production.
There are a lot of us with a MY22 VIN that keep get being pushed back for production. Mine is now scheduled for Nov 7th. I haven't seen anything later. I read it takes 3 days to convert the plant from MY22 to MY23. What I understand is if I have a 22 VIN it will be produced as a 22. I seriously doubt MY23 are going into production on Nov 15th, as is published.
 

Bad Actor

2.0L EcoBoost
Well-known member
First Name
Christopher
Joined
Jan 15, 2022
Threads
7
Messages
471
Reaction score
1,009
Location
SE Missouri
Vehicle(s)
01 Ranger XLT, 73 Mustang Base, 02 Toyota Camry
Engine
2.0L EcoBoost
The Administrator gets this info prior to the scheduling week. This is the scheduling for all models next week. The Maverick scheduling day next week is the 29th. This will more than likely be be for the production week of 11/21/22.
 

Last Truck Ever

2.5L Hybrid
Well-known member
Joined
May 23, 2022
Threads
28
Messages
971
Reaction score
2,053
Location
Alabama
Vehicle(s)
2023 Hybrid Maverick XLT
Engine
2.5L Hybrid
Clubs
 
There are a lot of us with a MY22 VIN that keep get being pushed back for production. Mine is now scheduled for Nov 7th. I haven't seen anything later. I read it takes 3 days to convert the plant from MY22 to MY23. What I understand is if I have a 22 VIN it will be produced as a 22. I seriously doubt MY23 are going into production on Nov 15th, as is published.
So, dumb question: when nothing that much changes in a model year beyond cruise being standard on XLs, what is actually involved in "changing a line over" for the 23's? Serious question, I just don't know and I'm pretty familiar with manufacturing. Would seem to be not much to it ? Yes, of course Tremor adds a twist, but otherwise?
 

DavesMav

Well-known member
First Name
Dave
Joined
Oct 12, 2021
Threads
5
Messages
452
Reaction score
605
Location
FL
Vehicle(s)
Maverick
The Administrator gets this info prior to the scheduling week. This is the scheduling for all models next week. The Maverick scheduling day next week is the 29th. This will more than likely be be for the production week of 11/21/22.
Exactly, so by the time we are seeing this data, NEXT week is now THIS week. They've always posted these anywhere from Friday-Sunday before the current week (Think about it, it can't be this week 9/19, as this week 9/19 is DONE in terms of scheduling...). In the past, scheduling weeks always had associated build weeks. This one says 2023 Mav scheduling starts 9/29 (WHICH IS DURING THE WEEK OF 9/26), but it does NOT list build weeks, I wouldn't hold my breath for 2023 scheduling actually starting this week as no build weeks are mentioned.
 

JoeTime

2.5L Hybrid
Well-known member
First Name
Joe
Joined
Apr 27, 2022
Threads
15
Messages
244
Reaction score
238
Location
47025
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
The Administrator gets this info prior to the scheduling week. This is the scheduling for all models next week. The Maverick scheduling day next week is the 29th. This will more than likely be be for the production week of 11/21/22.
Then so much for Ford saying the MY23's will go into production on Nov. 15th. They will still be making the MY22's on Nov 15th.
 
Sponsored

DavesMav

Well-known member
First Name
Dave
Joined
Oct 12, 2021
Threads
5
Messages
452
Reaction score
605
Location
FL
Vehicle(s)
Maverick
Now the thread title is even more confusing.. it says no maverick scheduling for this week 9/26, but the chart literally shows 2023 scheduling starts 9/29, which is during this week of 9/26...

Ford Maverick ⏰ No Maverick Scheduling This Week (9/26). 2023 Maverick Scheduling Starts 9/29/22 1664027911717
 

JoeTime

2.5L Hybrid
Well-known member
First Name
Joe
Joined
Apr 27, 2022
Threads
15
Messages
244
Reaction score
238
Location
47025
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
So, dumb question: when nothing that much changes in a model year beyond cruise being standard on XLs, what is actually involved in "changing a line over" for the 23's? Serious question, I just don't know and I'm pretty familiar with manufacturing. Would seem to be not much to it ? Yes, of course Tremor adds a twist, but otherwise?
I don't know either but I heard from the Fordvideoguy that the quick, 3 day turnover means not much change from MY22 to 23.
 

Mav_27

2.0L EcoBoost
Well-known member
Joined
Sep 18, 2021
Threads
10
Messages
279
Reaction score
352
Location
Michigan
Vehicle(s)
Ford Maverick
Engine
2.0L EcoBoost
So, dumb question: when nothing that much changes in a model year beyond cruise being standard on XLs, what is actually involved in "changing a line over" for the 23's? Serious question, I just don't know and I'm pretty familiar with manufacturing. Would seem to be not much to it ? Yes, of course Tremor adds a twist, but otherwise?
My XL is scheduled for production 10/17. Any chance they’ll throw in the cruise ? 🤣
 

Bad Actor

2.0L EcoBoost
Well-known member
First Name
Christopher
Joined
Jan 15, 2022
Threads
7
Messages
471
Reaction score
1,009
Location
SE Missouri
Vehicle(s)
01 Ranger XLT, 73 Mustang Base, 02 Toyota Camry
Engine
2.0L EcoBoost
I don't understand why you are having such a hard time with this. MY22 (in blue) is not scheduling next week. MY23 (in red) will be scheduling on Thursday, 9/29. Ford scheduling weeks begin on Mondays. Maverick scheduling is usually done Thursdays of any given scheduling week.
Sponsored

 
 




Top