- First Name
- Mark
- Joined
- Nov 15, 2021
- Threads
- 2
- Messages
- 330
- Reaction score
- 351
- Location
- Los Angeles
- Vehicle(s)
- Hybrid Lariat Built 3-9-23, Chevy EUV, Lexus RX350
- Engine
- 2.5L Hybrid
I got scheduled a couple weeks ago for 3/13 as a non-vin rollover then production week was bumped to 3/6! Hoping that sticked and doesn't get pushed back multiple times like I have read about.I wonder if Ford has scheduled all of the VIN-assigned rollovers. If so, then I have a chance (as a non-VIN rollover) to get scheduled. 473 days and counting...
Sponsored