My XL hybrid order was originally supposed to be built during the week of 7/25. I just found out it has been pushed back to the week of 8/22. At this rate the only scheduling available is for the month of September & October. At this point, I wouldn't be surprised if there was only 1 or 2 weeks of scheduling left for the year in order to handle any further pushbacks.