Sponsored

dlorton0844

2.5L Hybrid
Well-known member
First Name
Dustin
Joined
May 23, 2022
Threads
1
Messages
86
Reaction score
105
Location
East Central IL
Vehicle(s)
2007 Chrysler Town & Country
Engine
2.5L Hybrid
Hopefully they continue to build Hybrids...
 

Sponsored

pa-outdoorsman

2.0L EcoBoost
Well-known member
Joined
Jan 26, 2022
Threads
116
Messages
2,155
Reaction score
4,523
Location
PA
Vehicle(s)
2022 Maverick XLT, EB, LUX, FX4, 4K, Cactus Gray
Engine
2.0L EcoBoost
Clubs
 
So, that leaves two more weeks to schedule to close out MY22 -- weeks of 10/31 and 11/7.

It's getting to be crunch time, folks. At this point, hard to know whether I'd like to be surprised in being scheduled, or just take my chances with new colors, packages and private offer for MY23.
 

Shakesbear

2.0L EcoBoost
Well-known member
First Name
J. R.
Joined
Jan 5, 2022
Threads
3
Messages
1,027
Reaction score
1,183
Location
Heart of the Texas Hill Country
Vehicle(s)
Lariat AWD, FX4, 4K, Lux, no CP360 assist
Engine
2.0L EcoBoost
When was the "supposed" last day of 2022 production again??? By next Friday we will be into November build dates ;)
 

MichaelG

2.5L Hybrid
Well-known member
First Name
Michael
Joined
Jan 19, 2022
Threads
17
Messages
280
Reaction score
259
Location
SE Michigan
Vehicle(s)
2002 Ranger
Engine
2.5L Hybrid
When was the "supposed" last day of 2022 production again??? By next Friday we will be into November build dates ;)
Tim Bartz said that the last production date for MY22 is Nov. 7
 

pa-outdoorsman

2.0L EcoBoost
Well-known member
Joined
Jan 26, 2022
Threads
116
Messages
2,155
Reaction score
4,523
Location
PA
Vehicle(s)
2022 Maverick XLT, EB, LUX, FX4, 4K, Cactus Gray
Engine
2.0L EcoBoost
Clubs
 
Tim Bartz said that the last production date for MY22 is Nov. 7
I think the WEEK of 11/7. Pretty sure said MY23 production to commence 11/14
 

dnsholloway

2.5L Hybrid
Member
First Name
david
Joined
Aug 23, 2021
Threads
0
Messages
7
Reaction score
10
Location
Garden City mi.
Vehicle(s)
maverick xlt
Engine
2.5L Hybrid
According to the Dealership, I am the last week of August. 1 more week, come on! Not believing anything until I see it confirmed to be in production.
My XLT Hybrid went into production 7/29. now on a micro chip hold until Sept. sorry not what you wanted to hear.
 
Sponsored

raymaines

2.5L Hybrid
Well-known member
First Name
Ray
Joined
Sep 27, 2021
Threads
29
Messages
595
Reaction score
884
Location
Tacoma, Washington
Vehicle(s)
Alto Blue Lariat Lux Hybrid
Engine
2.5L Hybrid
Hopefully they continue to build Hybrids...
They will, or at least they think they will. I visited my dealer yesterday and was told I had a build date of Sept 26th. I know that doesn't really mean much while we're still in the middle of August, but at least Ford is planning to build my hybrid truck. Someday. Maybe in the near future. Maybe. I hope.
 

Raderb87

2.5L Hybrid
Active member
First Name
Brian
Joined
Jan 19, 2022
Threads
0
Messages
32
Reaction score
23
Location
Detroit Michigan
Vehicle(s)
2017 Ford Fusion
Engine
2.5L Hybrid
My XLT Hybrid went into production 7/29. now on a micro chip hold until Sept. sorry not what you wanted to hear.
Oh yeah, I'm fully aware of all the issues. Just want to get a scheduled date at this point. Get one step closer in this never ending go around. The worst part, is the lake of transparency, dealer and Ford.
 

Rob Cactus Gray

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Sep 16, 2021
Threads
27
Messages
1,838
Reaction score
4,101
Location
Sierra Vista AZ
Vehicle(s)
11 Prius
Engine
2.5L Hybrid
According to the Dealership, I am the last week of August. 1 more week, come on! Not believing anything until I see it confirmed to be in production.
I wouldn’t believe that either
 
 




Top