Finally after 6 months wait with no word I got my email with the production week of March 17th.
Order was placed on August 2,2024. Here is a picture of what they are building for me.
Does anyone know what constraints there are on a 25 Lariat that might be stopping mine from being built. My dealer has not been able to rely me. If I knew I would remove it. Ordered on August 2nd and no word of scheduling.
I ordered a fully loaded Lariat on 8/2/24. I received an order number within 3 days of my order. I kept checking with my dealer who could provide no information. I think I bothered them enough that I got another email last week stating my vehicle was in scheduling. That's all I have heard. Has...
I t
I got the order confirmation email within a week. Nothing since then. I think the Lariat will be scheduled for February becasethe trailer and hitch assist are standard and were not built in build 1 but are for build 2. That what I've gathered from hours reading this forum.
I'm in the same boat as you Darrell. Email that they have my order but not a word since. ordered a loaded Lariet on August 2nd. I think the trailer assist and hitch assist is what held it up. I hope to be in job 2.
I ordered a 2025 Maverick Lariet hybrid on August 2nd. Received the 1st email that stated they had received my order. No further word from them, however I did order the trailer assist. I think that is what's holding it up.