  1. 2025 Maverick Job 1 Production Starts 11/11/24

    The exhausted availability is just for the one week. The wheels and tires have been available many times. They don't always show the add-ons/accessories in exhausted availability. You would've been scheduled long ago if you didn't have the other add-ons. They are making plenty of the XLTs with...
  2. 2025 Maverick Job 1 Production Starts 11/11/24

    The wheels and tires have been available many times and they're the same on the 2025 Maverick. It's definitely one of your other add-ons holding up the order if you haven't been scheduled yet. Like I said, 24 XLT ordered 7/9 with the same wheels and tires and I'm scheduled for the week of Sept 9th.
  3. 2025 Maverick Job 1 Production Starts 11/11/24

    I'd bet it's either the floor liners or the tonneau cover holding up your order.
  4. 2025 Maverick Job 1 Production Starts 11/11/24

    Did you have any other addons on your order? I scheduled my XLT with the standard wheel and tires on 7/9/24 and it is supposed to be built on week of 9/9/2024.
  5. 2025 Ford Maverick Order Banks Now Open

    Any idea what the build timeline is for 2025 XLT FWDs? I'd like to change my order with my local dealer to a 2025 XLT instead of the 2024 XLT I ordered, but don't want to wait past January.
  6. 2024 Hybrid XLT Lux Scheduled!

    I ordered my Maverick on 7/17/2024 and got it scheduled on 7/19/2024. Looks like I'm all set for a September 9th build week. Looking forward to getting it! Anyone had their builds get done earlier than scheduled or am I pretty much locked in for week of 9/9?