All sounds good. Any pictures or how to do it on this: 2 fairly heavy folded up E-Bikes (they fit with being able to still close the roll up tonneau) I have a Lectric XP3.0 Thanks, Mike
I was all excited when my XLT went into production July 31, and on Aug 1 showed up as built-awaiting shipping. Now it is two weeks later, Aug 14th and still listing as awaiting shipping. I guess nothing comes easy in getting a Maverick. I need to get it to the Denver area.