Sponsored

Search results

  1. 2025 Maverick Scheduling This Week (4/17/25) for Production Weeks 5/15 - 6/16

    Production Weeks: 5/5 - 06/16 - Retail Scheduling Only. - Dressing period for OTD Stock orders. - Required Orders: - Front Wheel Drive - Very Limited to Exhausted Availability: - Part time drive (AWD). - Tremor Version (W8N).
  2. 2025 Maverick Scheduling This Week (4/10/25) for Production Weeks 5/5 - 5/26

    Notes: - Production Weeks: 5/5 - 5/26. - Clean up Scheduling. - Required Orders: - The XLT Version with the FX4 Off-Road Package (17S). - Very Limited to Exhausted Availability: - Part time drive (AWD). - Tremor Version (W8N).
  3. 2025 Maverick Scheduling This Week (4/3/25) for Production Weeks 5/5 - 5/26

    Notes: - Production Weeks: 5/5 - 5/26. - Clean up Scheduling. - Required Orders: - The XLT Version - Very Limited to Exhausted Availability: - Part time drive. - Tremor Version (W8N).
  4. 2025 Maverick Scheduling This Week (3/20/25) for Production Weeks 5/5-5/26

    Notes: • Production Weeks: 5/5 - 5/26. • Main Commit. • Required Orders: - The XLT Version with the FX4 Off-Road Package (17S). • Very Limited to Exhausted Availability: ⭐ - Part time drive. • Limited Availability: ⭐ - Tremor Version (W8N).
  5. 2025 Maverick Scheduling This Week (3/13/25) for Production Weeks 5/5 - 5/26

    Notes: • Production Weeks: 5/5 - 5/26. • Retail Scheduling only. • Dressing Period. • Required Orders: - The XLT Version with the FX4 Off-Road Package (17S) has better chance to get scheduled for Main Commit next week.
  6. 2025 Maverick Scheduling This Week (2/27/25) for Production Weeks 3/31 - 4/28

    Notes: • Production Weeks: 3/31 - 4/28. • Clean Up Scheduling. • Very Limited to Exhausted Availability: - Advanced All Wheel Drive (AWD). - All Wheel Drive (AWD). - Part Time Drive - T7Q - 225/65R17 102H All-Season (A/S) BSW (Std. on XL & XLT). - 59D - Black Edition Hood Decal (Inc. on Black...
  7. 2025 Maverick Scheduling This Week (2/6/25) for Production Weeks 3/3 - 3/24

    Notes: Production Weeks: 3/3 - 3/24. Clean Up Scheduling. Very Limited to Exhausted Availability: ⭐ - XL Version (W8A, W8B). - Tremor Version (W8N). ⭐ - Lobo Version (W8P). - All Wheel Drive (AWD). - Advanced All Wheel Drive (AWD). - 6 Way Driver Seat Adjuster. ⭐ - 64T - 17” Carbonized Gray...
  8. 2025 Maverick Scheduling This Week (1/30/25) for Production Weeks 3/3 - 3/24

    Notes: • Production Weeks: 3/3 - 3/24. • Clean Up Scheduling. • Very Limited to Exhausted Availability: - Tremor Version (W8N). - All Wheel Drive (AWD). - 6 Way Driver Seat Adjuster. ⭐ - Advanced All Wheel Drive (AWD). ⭐ - Mini Spare Tire.
  9. 2025 Maverick Scheduling This Week (1/16/25) for Production Weeks 2/24 - 3/24/25

    Notes: • Production Weeks: 2/24 - 3/24. • Dressing period for OTD Fitness. • Retail scheduling only. • Very Limited to Exhausted Availability: ⭐ - 993 - 2.5L Hybrid Engine. ⭐ - All Wheel Drive (AWD). ⭐ - 6 - Way Manual Adjustable Driver. - 64T - 17” Carbonized Gray painted Aluminum Wheel (Std...
  10. 2025 Maverick Scheduling This Week (1/9/25) for Production Weeks 2/3 - 2/24/25

    Notes: • Production Weeks: 2/3-2/24. • Clean Up Scheduling. • Very Limited to Exhausted Availability: ⭐ - XL Version (W8A, W8B). ⭐ - Tremor Version (W8N).
  11. 2025 Maverick Scheduling This Week (12/12/24) for Production Weeks 2/3 - 2/24/25

    Notes: • Production Weeks: 2/3-2/24. • Limited Availability: ⭐ - FWD - 2 Wheel L/H Front Drive. • Very Limited to Exhausted Availability: ⭐ - XL Version (W8A, W8B). ⭐ - Tremor Version (W8N). ⭐ - 64T - 17” Carbonized Gray painted Aluminum Wheel (Standard on XLT).
  12. 2025 Maverick Scheduling This Week (12/5/24) for Production Weeks 2/3 - 2/24/25

    Notes: • Production Weeks: 2/3-2/24. • The OTD order generation for Maverick occurred on November 29th. Please review your order bank.
  13. Latest 2025 Maverick Production Key Commodity Constraints + Total Retail Unscheduled Orders (11/18/24)

    There are currently 1,670 total retail unscheduled orders, as of 11/18/24. Retail USOB: Is the current mix of retail orders in the unscheduled order bank (USOB) at the time the report was run. The report only looks at orders that are “clean”, meaning they do not have a compatibility error...
  14. 2025 Maverick Scheduling This Week (11/21/24) for Production Week 12/2-1/27

    Notes: • Production Weeks: 12/2 - 1/27. • Job#1 Balance Out Scheduling. Important: - OTD Fitness Orders will be released until weekend of 11/30. Update: - Lobo Version (W8P) will be available to scheduled on Job#2. • Required Orders: - XLT Version (W8H, W8J) with the Black Appearance...
  15. 2025 Maverick Scheduling This Week (11/7/24) for Production Weeks 12/2 - 12/16

    Notes: • Production Weeks: 12/2 - 12/16. • Clean up Commit. - Lobo Version (W8P) will be available on 2025 Q1. Best Availability: - XL Version (W8A, W8B). - XLT Version (W8H, W8J) with the Black Appearance Package (59D). - Lariat Version (W8S). Limited Availability: ⭐ - 4 Wheel L/H Full Time...
  16. 2025 Maverick Scheduling This Week (10/24/24) for Production Weeks 12/2 - 12/16

    Notes: • Production Weeks: 12/2 - 12/16. • Main Commit. Update: - Lobo Version (W8P) will be available on 2025 Q1. • Limited Availability: ⭐ - 993 - 2.5L Hybrid w/ Automatic Continuously Variable Transmission. ⭐ - 2 Wheel L/H Front Drive. (FWD). • Very Limited to Exhausted Availability: -...
  17. 2025 Maverick Scheduling This Week (10/17/24) for Production Weeks 12/9 - 12/16

    Notes: • Production Weeks: 12/9 - 12/16 • Dressing Period. • Retail Scheduling Only. Update: - Lobo Version (W8P) will be available on 2025 Q1. Limited Availability: - FWD - 2 Wheel L/H Front Drive. - XL Version (W8A, W8B)
  18. 2025 Maverick Scheduling This Week (9/26/24) for Production Weeks 11/11 - 11/25

    Notes: • Main Commit. • Production weeks: 11/11 - 11/25. Update: - Lobo Version (W8P) will be available on 2025 Q1. Limited Availability: - 993 - 2.5L Hybrid w/ Automatic Continuously Variable Transmission Engine. Exhausted Availability: - Versions: W8A, W8B - XL Series. - Versions: W8N -...




Top