Sponsored

A Dodge that drives Fords

2.0L EcoBoost
Well-known member
Joined
Jul 30, 2021
Threads
25
Messages
751
Reaction score
846
Location
Wisconsin
Vehicle(s)
Ford Taurus Ford Ranger
Engine
2.0L EcoBoost
Correct build date of 2/8/22. The window sticker doesn't show when it's shipped or expected delivery.
Thanks. The first one said 3/15/2022 and this is the latest one.

Ford Maverick đź“’ Maverick Build Process Guide! - Window Sticker, Blend Date, Production Rotation Number, Built & Shipped Emails, Delivery Date Estimates & More Screenshot_20220223-192718~2
Sponsored

 

suavegunner

New member
Joined
Mar 2, 2022
Threads
0
Messages
4
Reaction score
1
Location
Socal
Vehicle(s)
Maverick
Engine
Undecided
Does anyone have any advice on which dealer to order from at msrp?
 

ShadowBlack XL440

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Jan 21, 2022
Threads
9
Messages
732
Reaction score
841
Location
Northern Ohio
Vehicle(s)
Non-Ford, not enought room to list..........
Engine
2.5L Hybrid
Does anyone have any advice on which dealer to order from at msrp?
As I understand it, no new orders for Mavericks are being accepted for 2022 MY. Have to wait until Aug. to order a 2023 MY or find a 2022 by chance on a dealer's lot and pay the dealer markup.
 

suavegunner

New member
Joined
Mar 2, 2022
Threads
0
Messages
4
Reaction score
1
Location
Socal
Vehicle(s)
Maverick
Engine
Undecided
As I understand it, no new orders for Mavericks are being accepted for 2022 MY. Have to wait until Aug. to order a 2023 MY or find a 2022 by chance on a dealer's lot and pay the dealer markup.
Thanks for the information.
 

nickmav

2.5L Hybrid
Well-known member
First Name
nick
Joined
Aug 23, 2021
Threads
12
Messages
206
Reaction score
209
Location
canada
Vehicle(s)
jeep
Engine
2.5L Hybrid
Anybody know how long its been recently between PCM modules and actual shipment? Sticker says Rail.

Im in Canada not sure if that matters.
 

Sponsored

mpc999

2.5L Hybrid
Well-known member
First Name
Mark
Joined
Jul 23, 2021
Threads
6
Messages
73
Reaction score
73
Location
75704
Vehicle(s)
Honda
Engine
2.5L Hybrid
This great guide is reposted from sister-site Bronco6G.com (by member Ksjrb03)

Ok, this post is meant to give a thorough understanding of how the build process works and what all these terms mean, for those of you asking. First thing you have to understand, this is not like ordering something off Amazon. There are tools and trackers, but they are often way off on their estimated times, or come in long after the vehicle has actually been built or shipped. Here is a great thread with links to all the various trackers etc.

https://www.mavericktruckclub.com/forum/threads/🧭-maverick-build-tracking-links.2882/


First off the window sticker.

Reference example (labeled)

1631559174311-png.png


1631559185611-png.png




1633617466655-png.png



You should get your window sticker about a week before your "blend" date. Blend is the point where the chassis and body meet on the assembly line to go through final assembly. The work on the body and chassis has already begun a few shifts before this date. The blend above shows "2021/10/14" So this Maverick is scheduled to go down final assembly on 10/14.

1633617679030-png.png



This shows that this Maverick is the 496th out of 881 scheduled units to begin the final assembly process on 10/14. FYI, This number is both Maverick and Bronco Sport since they run down the same line.

1633617861032-png.png



Number next to blend date is the rotation number. This is the main number production workers pay attention to. It is the master sequencing number. 4015 will blend after 4014. 496/881 is a scheduled target, but they may be a bit behind or ahead for the day/week. Rotation number will roll back to 0001 after 9999.


So today is your blend date, now what. You wait! The final assembly process takes more than a shift to complete, lets say 1.5 shifts to get from blend through final QC. If your rotation number comes up on end of first shift or during second shift, you will not be complete until the next day.

Once your build is complete, the Ford system should send you a build email, but its not that simple. Some people get them quick, some are delayed days. If your Maverick has to go to the Mod shop for accessories fitting (tonneau cover, bed extender, body graphics, etc.) that will delay your build notification. PPF has to go to an off-site body shop and that will delay as well. If your Maverick is selected for random extra quality checks is another delay. If quality checks find an issue that needs to be addressed, that could be a lengthy delay. Then there is just the plain fact the Ford system isn't great and some people never get a built email.

While we sit and wait wondering if our Maverick has been built yet, we can check if our "modules have popped". Ford has an online as built service site that shows your PCM and BCE modules. If your VIN starts showing something as the below screenshot, it means your computers are "alive" and your Maverick has been built.

https://www.motorcraftservice.com/Home/SetCountry?returnUrl=/asbuilt

1633618976934-png.png



Now that our Maverick is built, next we wait for shipping. There are two ways units leave the plant, by rail or by convoy (18 wheeler car hauler). Your window sticker will show which way your Maverick leaves.

1633619089846-png.png



Your Maverick can leave the shipping yard quick, or it can sit there a while. It seems lately convey is sitting a bit, there are trucker shortages really hurting the industry. Rail will ship to a regional rail yard, and sit there until there is a convoy full to send to your dealer or region.

Once your Maverick ships you will get another email from Ford notifying you with delivery estimates. These estimates can be way off sometimes, your dealer should be able to tell you how long shipping usually takes to them.

https://www.mavericktruckclub.com/forum/threads/🧭-maverick-build-tracking-links.2882/

The above tracker link has links and instructions to tracking your shipment. Seems to be easier to track by convoy. To track Rail you will need your dealer to give you the rail car number your Maverick is sitting in.
Can anybody tell me what "NB" in the "Ship To" in the upper right corner of my Window Sticker means? Thanks
 

Sissie

New member
First Name
Frances
Joined
Mar 8, 2022
Threads
0
Messages
2
Reaction score
0
Location
Gaylesville Alabama
Vehicle(s)
Nothing
Ordered Oct 30, 2021, Was told it was still not pulled by Ford, so other words still no production and no info. Needing something ASAP.... may have to go find something else........
 

RONR11

2.5L Hybrid
Well-known member
First Name
Ron
Joined
Sep 1, 2021
Threads
18
Messages
100
Reaction score
46
Location
Hartsville SC
Vehicle(s)
2019 Ranger/Maverick
Engine
2.5L Hybrid
Just had Chat with agent and she said mine was entered today and is scheduled for next Wednesday . Looking at other posts approximately 1-2day for actual build.Anybody have a guess on time to dealer? Txs
 

dedMann

2.0L EcoBoost
Well-known member
Joined
Sep 6, 2021
Threads
3
Messages
118
Reaction score
147
Location
The Zone
Vehicle(s)
FX4/LUX,60 Bug,ElementSC 5mt,Buell XB12X,BICYCLES!
Engine
2.0L EcoBoost
For this to be an educational post; there should be a maverick specific window sticker. Not to mention one that is less than a decade plus old....
 
Sponsored

Turtle

2.5L Hybrid
Well-known member
First Name
Dennis
Joined
Jul 26, 2021
Threads
53
Messages
762
Reaction score
875
Location
MD
Vehicle(s)
Escape Hybrid
Engine
2.5L Hybrid
Just had Chat with agent and she said mine was entered today and is scheduled for next Wednesday . Looking at other posts approximately 1-2day for actual build.Anybody have a guess on time to dealer? Txs
Depends on location. Gave me a window of may 3-9 shipped March 28th.
 

LM42

2.0L EcoBoost
Banned
Banned
First Name
Luke
Joined
Jan 21, 2022
Threads
13
Messages
761
Reaction score
1,158
Location
Phoenix, AZ
Vehicle(s)
Maverick XLT FX4 EB
Engine
2.0L EcoBoost
This great guide is reposted from sister-site Bronco6G.com (by member Ksjrb03)

Ok, this post is meant to give a thorough understanding of how the build process works and what all these terms mean, for those of you asking. First thing you have to understand, this is not like ordering something off Amazon. There are tools and trackers, but they are often way off on their estimated times, or come in long after the vehicle has actually been built or shipped. Here is a great thread with links to all the various trackers etc.

https://www.mavericktruckclub.com/forum/threads/🧭-maverick-build-tracking-links.2882/


First off the window sticker.

Reference example (labeled)

1631559174311-png.png


1631559185611-png.png




1633617466655-png.png



You should get your window sticker about a week before your "blend" date. Blend is the point where the chassis and body meet on the assembly line to go through final assembly. The work on the body and chassis has already begun a few shifts before this date. The blend above shows "2021/10/14" So this Maverick is scheduled to go down final assembly on 10/14.

1633617679030-png.png



This shows that this Maverick is the 496th out of 881 scheduled units to begin the final assembly process on 10/14. FYI, This number is both Maverick and Bronco Sport since they run down the same line.

1633617861032-png.png



Number next to blend date is the rotation number. This is the main number production workers pay attention to. It is the master sequencing number. 4015 will blend after 4014. 496/881 is a scheduled target, but they may be a bit behind or ahead for the day/week. Rotation number will roll back to 0001 after 9999.


So today is your blend date, now what. You wait! The final assembly process takes more than a shift to complete, lets say 1.5 shifts to get from blend through final QC. If your rotation number comes up on end of first shift or during second shift, you will not be complete until the next day.

Once your build is complete, the Ford system should send you a build email, but its not that simple. Some people get them quick, some are delayed days. If your Maverick has to go to the Mod shop for accessories fitting (tonneau cover, bed extender, body graphics, etc.) that will delay your build notification. PPF has to go to an off-site body shop and that will delay as well. If your Maverick is selected for random extra quality checks is another delay. If quality checks find an issue that needs to be addressed, that could be a lengthy delay. Then there is just the plain fact the Ford system isn't great and some people never get a built email.

While we sit and wait wondering if our Maverick has been built yet, we can check if our "modules have popped". Ford has an online as built service site that shows your PCM and BCE modules. If your VIN starts showing something as the below screenshot, it means your computers are "alive" and your Maverick has been built.

https://www.motorcraftservice.com/Home/SetCountry?returnUrl=/asbuilt

1633618976934-png.png



Now that our Maverick is built, next we wait for shipping. There are two ways units leave the plant, by rail or by convoy (18 wheeler car hauler). Your window sticker will show which way your Maverick leaves.

1633619089846-png.png



Your Maverick can leave the shipping yard quick, or it can sit there a while. It seems lately convey is sitting a bit, there are trucker shortages really hurting the industry. Rail will ship to a regional rail yard, and sit there until there is a convoy full to send to your dealer or region.

Once your Maverick ships you will get another email from Ford notifying you with delivery estimates. These estimates can be way off sometimes, your dealer should be able to tell you how long shipping usually takes to them.

https://www.mavericktruckclub.com/forum/threads/🧭-maverick-build-tracking-links.2882/

The above tracker link has links and instructions to tracking your shipment. Seems to be easier to track by convoy. To track Rail you will need your dealer to give you the rail car number your Maverick is sitting in.
This great guide is reposted from sister-site Bronco6G.com (by member Ksjrb03)

Ok, this post is meant to give a thorough understanding of how the build process works and what all these terms mean, for those of you asking. First thing you have to understand, this is not like ordering something off Amazon. There are tools and trackers, but they are often way off on their estimated times, or come in long after the vehicle has actually been built or shipped. Here is a great thread with links to all the various trackers etc.

https://www.mavericktruckclub.com/forum/threads/🧭-maverick-build-tracking-links.2882/


First off the window sticker.

Reference example (labeled)

1631559174311-png.png


1631559185611-png.png




1633617466655-png.png



You should get your window sticker about a week before your "blend" date. Blend is the point where the chassis and body meet on the assembly line to go through final assembly. The work on the body and chassis has already begun a few shifts before this date. The blend above shows "2021/10/14" So this Maverick is scheduled to go down final assembly on 10/14.

1633617679030-png.png



This shows that this Maverick is the 496th out of 881 scheduled units to begin the final assembly process on 10/14. FYI, This number is both Maverick and Bronco Sport since they run down the same line.

1633617861032-png.png



Number next to blend date is the rotation number. This is the main number production workers pay attention to. It is the master sequencing number. 4015 will blend after 4014. 496/881 is a scheduled target, but they may be a bit behind or ahead for the day/week. Rotation number will roll back to 0001 after 9999.


So today is your blend date, now what. You wait! The final assembly process takes more than a shift to complete, lets say 1.5 shifts to get from blend through final QC. If your rotation number comes up on end of first shift or during second shift, you will not be complete until the next day.

Once your build is complete, the Ford system should send you a build email, but its not that simple. Some people get them quick, some are delayed days. If your Maverick has to go to the Mod shop for accessories fitting (tonneau cover, bed extender, body graphics, etc.) that will delay your build notification. PPF has to go to an off-site body shop and that will delay as well. If your Maverick is selected for random extra quality checks is another delay. If quality checks find an issue that needs to be addressed, that could be a lengthy delay. Then there is just the plain fact the Ford system isn't great and some people never get a built email.

While we sit and wait wondering if our Maverick has been built yet, we can check if our "modules have popped". Ford has an online as built service site that shows your PCM and BCE modules. If your VIN starts showing something as the below screenshot, it means your computers are "alive" and your Maverick has been built.

https://www.motorcraftservice.com/Home/SetCountry?returnUrl=/asbuilt

1633618976934-png.png



Now that our Maverick is built, next we wait for shipping. There are two ways units leave the plant, by rail or by convoy (18 wheeler car hauler). Your window sticker will show which way your Maverick leaves.

1633619089846-png.png



Your Maverick can leave the shipping yard quick, or it can sit there a while. It seems lately convey is sitting a bit, there are trucker shortages really hurting the industry. Rail will ship to a regional rail yard, and sit there until there is a convoy full to send to your dealer or region.

Once your Maverick ships you will get another email from Ford notifying you with delivery estimates. These estimates can be way off sometimes, your dealer should be able to tell you how long shipping usually takes to them.

https://www.mavericktruckclub.com/forum/threads/🧭-maverick-build-tracking-links.2882/

The above tracker link has links and instructions to tracking your shipment. Seems to be easier to track by convoy. To track Rail you will need your dealer to give you the rail car number your Maverick is sitting in.
I am apparently blind. I cannot see on the sticker posted anything that matches the blend date you highlight below that. I have a window sticker for my truck and it is "in production" but trying to get off of my sticker what you are referencing is not getting me anywhere LOL
 

UncleDuke

Well-known member
Joined
Sep 8, 2021
Threads
25
Messages
236
Reaction score
549
Location
nevada
Vehicle(s)
fusion
Sure my window sticker is dated 5/31/2022, It has never updated, no blend date, no production date. No ramp information.

But it was built and supposedly shipped. I have no real idea where it is at.
 

ShadowBlack XL440

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Jan 21, 2022
Threads
9
Messages
732
Reaction score
841
Location
Northern Ohio
Vehicle(s)
Non-Ford, not enought room to list..........
Engine
2.5L Hybrid
I am apparently blind. I cannot see on the sticker posted anything that matches the blend date you highlight below that. I have a window sticker for my truck and it is "in production" but trying to get off of my sticker what you are referencing is not getting me anywhere LOL
The blend date is at the bottom of the window stick below the price.
Ford Maverick đź“’ Maverick Build Process Guide! - Window Sticker, Blend Date, Production Rotation Number, Built & Shipped Emails, Delivery Date Estimates & More 1657807713055
 

ShadowBlack XL440

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Jan 21, 2022
Threads
9
Messages
732
Reaction score
841
Location
Northern Ohio
Vehicle(s)
Non-Ford, not enought room to list..........
Engine
2.5L Hybrid
Sure my window sticker is dated 5/31/2022, It has never updated, no blend date, no production date. No ramp information.

But it was built and supposedly shipped. I have no real idea where it is at.
I would be interested in seeing that window sticker for comparison.
Sponsored

 
 




Top